top of page

HORSE STABLE RENOVATION, 2025, MEKAINES, QATAR

The renovation of the horse stable involved a comprehensive approach to enhance safety and functionality. We demolished existing walls and extended concrete columns to accommodate a new elevation. The old, rusted doors were replaced with durable new doors, and the roof was entirely removed and replaced with a sturdy new structure. Additionally, we paved the floor with interlock pavement and a new drainage system was installed, complete with a septic tank, ensuring a clean and efficient environment for our horses.

​OBJECTIVES

Ensure Optimal Functionality: Maintain all building systems and components to ensure they function effectively and efficiently. Provide a Safe Environment for horses: Implement safety measures and conduct regular inspections to ensure the building meets all safety and health regulations. Enhance Comfort: Address any issues that affect the comfort of the horse, including but not limited to ventilation, plumbing, and electrical systems.
Manage Repairs and Upgrades: Handle any necessary repairs and upgrades to keep the facility in top condition.​

​

CLIENT: AL NASSER STUD

PROJECT STATUS: Completed

BEFORE

IMG-20250626-WA0017_edited.jpg
IMG-20250626-WA0020_edited_edited.jpg
IMG-20250626-WA0021_edited.jpg
IMG-20250626-WA0026_edited.jpg
IMG-20250626-WA0010_edited.jpg
WhatsApp Image 2025-07-03 at 09.22_edited.jpg
IMG-20250629-WA0016_edited.jpg
IMG-20250625-WA0125_edited.jpg

AFTER

bottom of page